Tracking Meeting on 18 July 2007

From Nuclear Physics Group Documentation Pages
Revision as of 15:39, 18 July 2007 by Hovanes (talk | contribs)
Jump to navigationJump to search
  • The first prototype should be available begining October of 2007.
  • FSSR2 chip are going to be procured by JLab (approx 177 chips for ~$8K) and should be shipped to Moscow.
  • Amrit's group, mostly Tanest, is working on the firmware for the FSSR2 chip readout.
  • There should be a clas-note out about FSSR2 design of the modules.
  • There seems to be a consensus that the forward SVT will used "disk dsign".
  • Amrit's group alrady has a laser module with 650nM wave length (BNL 065 optical module).