Difference between revisions of "Shift Workers Documentation"

From Nuclear Physics Group Documentation Pages
Jump to navigationJump to search
 
(6 intermediate revisions by 3 users not shown)
Line 7: Line 7:
 
Documentation
 
Documentation
 
|-
 
|-
|[[Monitor NMR data and check data output.]]
+
|[[Data Output Manual|Monitor NMR data and check data output]]
 
|David
 
|David
 
|-
 
|-
|[[Ramp up and down the magnet.]]
+
|[[Ramp up and down the magnet]]
 
|Google Doc/David  
 
|Google Doc/David  
 
|-
 
|-
|[[Monitor and operate the microwaves / know how to find correct frequency.]]
+
|[[TE Measurements]]
 +
|Karl/David
 +
|-
 +
|[[Monitor and operate the microwaves / know how to find correct frequency]]
 
|Ellie/David
 
|Ellie/David
 
|-
 
|-
Line 25: Line 28:
 
|Nathaly
 
|Nathaly
 
|-
 
|-
|[[Monitor vacuum pumps and change or replace a pump if needed.]]
+
|[[Monitor Vacuum System]]
|Nathaly
 
|-
 
|[[Monitor flowmeters.]]
 
 
|Nathaly
 
|Nathaly
 
|-
 
|-
|[[Monitor shells pressure and follow the procedures of a possible leak.]]
+
|[[Monitor flow meters]]
 
|Nathaly
 
|Nathaly
 
|-
 
|-
|[[Monitor/Operating needle valves.]]
+
|[[Monitor/Operating needle valves]]
 
|Google Doc/Michael
 
|Google Doc/Michael
 
|-
 
|-
|[[Monitor fridge temperatures and make sure to turn on/off heaters inside the Fridge.]]
+
|[[Monitor fridge temperatures and make sure to turn on/off heaters inside the Fridge]]
 
|Karl
 
|Karl
 
|-
 
|-
Line 43: Line 43:
 
|Ellie/Nathaly
 
|Ellie/Nathaly
 
|-
 
|-
|[[Monitor LHe level in the Magnet and call for fillings.]]
+
|[[Monitor LHe level in the Magnet and call for fillings]]
 
|Google Doc
 
|Google Doc
 
|-
 
|-
Line 49: Line 49:
 
|Future Work
 
|Future Work
 
|-
 
|-
|[[Magnet refills.]]
+
|[[Magnet refills]]
 
|Google Doc
 
|Google Doc
 
|-
 
|-
Line 58: Line 58:
 
|Marie
 
|Marie
 
|-
 
|-
|[[Calculation of LHe to vapor to convert to flowmeter reading.]]
+
|[[Calculation of LHe to vapor to convert to flowmeter reading]]
 
|Michael
 
|Michael
 
|}
 
|}

Latest revision as of 19:21, 14 August 2020

In the process of complete the documentation needed for the shift workers to be in the DNP Lab at UNH. The following sections need to be included:

Section Responsible of  

Documentation

Monitor NMR data and check data output David
Ramp up and down the magnet Google Doc/David
TE Measurements Karl/David
Monitor and operate the microwaves / know how to find correct frequency Ellie/David
VNA/VME swaps and calibrations Ellie/David
Setup system for changes in the polarization parameters (B, T, NMR, target…) Physics Documentation Karl
Log and report changes in the system Nathaly
Monitor Vacuum System Nathaly
Monitor flow meters Nathaly
Monitor/Operating needle valves Google Doc/Michael
Monitor fridge temperatures and make sure to turn on/off heaters inside the Fridge Karl
Heat Straps monitor / External heater of the separator line Ellie/Nathaly
Monitor LHe level in the Magnet and call for fillings Google Doc
Monitor LHe in the Fridge and adjust them if needed Future Work
Magnet refills Google Doc
Target swaps Karl
Repair NMR cable Marie
Calculation of LHe to vapor to convert to flowmeter reading Michael

Google Doc means that part of the section or the section is already written here.

Future Discussion:

Define Shift Leader and target operators tasks and names

Shift Checklist: Physical (What should be included?)

Shift Summary: At the end of the shift in the Logbook (What should be included?)

Google Doc or Wiki?