2015-07 to 2015-08 Cool Downs

From Nuclear Physics Group Documentation Pages
Revision as of 17:12, 25 August 2015 by Elong (talk | contribs) (Created page with "=7/30/2015 Calibration Runs= [http://nuclear.unh.edu/~elong/analysis_files/2015-08-25/2015-07-30-analysis.ods Analysis files] =8/4/2015 First Fridge Cool-Down with LN2= [ht...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

7/30/2015 Calibration Runs

Analysis files

8/4/2015 First Fridge Cool-Down with LN2

Analysis Files

Temperatures

2015-08-04-ab1t.png

2015-08-04-ab4t.png

2015-08-04-ccst.png

2015-08-04-pillt.png

2015-08-04-vapprest.png

2015-08-04-nmrt.png

Resistance

2015-08-04-ab1r.png

2015-08-04-ab4r.png

2015-08-04-ccsr.png

2015-08-04-pillr.png

Pressure and Flow

2015-08-04-vappresp.png

2015-08-04-flow.png

Temp-Flow Relationship

2015-08-04-tempflow.png

8/20/2015 Second Fridge Cool-Down with LN2

Analysis Files

Temperature

2015-08-20-temps.png

Resistance

2015-08-20-ab-res.png

2015-08-20-ccs-res.png

Vapor Pressure

2015-08-20-vappresp.png