Tracking Meeting on 18 July 2007
From Nuclear Physics Group Documentation Pages
Jump to navigationJump to search- The first prototype should be available begining October of 2007.
 - FSSR2 chip are going to be procured by JLab (approx 177 chips for ~$8K) and should be shipped to Moscow.
 - There should be a clas-note out about FSSR2 design of the modules.
 - There seems to be a consensus that the forward SVT will used "disk dsign".
 - Amrit's group alrady has a laser module with 650nM wave length (BNL 065 optical module).