Difference between revisions of "Shift Workers Documentation"
From Nuclear Physics Group Documentation Pages
Jump to navigationJump to searchLine 28: | Line 28: | ||
|Nathaly | |Nathaly | ||
|- | |- | ||
− | |[[Monitor | + | |[[Monitor flow meters]] |
|Nathaly | |Nathaly | ||
|- | |- |
Revision as of 03:33, 11 June 2020
In the process of complete the documentation needed for the shift workers to be in the DNP Lab at UNH. The following sections need to be included:
Section | Responsible of
Documentation |
---|---|
Monitor NMR data and check data output | David |
Ramp up and down the magnet | Google Doc/David |
Monitor and operate the microwaves / know how to find correct frequency | Ellie/David |
VNA/VME swaps and calibrations | Ellie/David |
Setup system for changes in the polarization parameters (B, T, NMR, target…) Physics Documentation | Karl |
Log and report changes in the system | Nathaly |
Monitor Vacuum System | Nathaly |
Monitor flow meters | Nathaly |
Monitor/Operating needle valves | Google Doc/Michael |
Monitor fridge temperatures and make sure to turn on/off heaters inside the Fridge | Karl |
Heat Straps monitor / External heater of the separator line | Ellie/Nathaly |
Monitor LHe level in the Magnet and call for fillings | Google Doc |
Monitor LHe in the Fridge and adjust them if needed | Future Work |
Magnet refills. | Google Doc |
Target swaps | Karl |
Repair NMR cable | Marie |
Calculation of LHe to vapor to convert to flowmeter reading | Michael |
Google Doc means that part of the section or the section is already written here.
Future Discussion:
Define Shift Leader and target operators tasks and names
Shift Checklist: Physical (What should be included?)
Shift Summary: At the end of the shift in the Logbook (What should be included?)
Google Doc or Wiki?