Difference between revisions of "Shift Workers Documentation"
From Nuclear Physics Group Documentation Pages
Jump to navigationJump to searchLine 65: | Line 65: | ||
Google Doc means that part of the section or the section is already written [https://docs.google.com/document/d/1ecbCTTtgoKBhofpUS1OsZVxOxAfA9XxAiUHVvF13A3o/edit here]. | Google Doc means that part of the section or the section is already written [https://docs.google.com/document/d/1ecbCTTtgoKBhofpUS1OsZVxOxAfA9XxAiUHVvF13A3o/edit here]. | ||
− | Future Discussion: | + | '''Future Discussion:''' |
+ | |||
Define Shift Leader and target operators tasks and names | Define Shift Leader and target operators tasks and names | ||
+ | |||
Shift Checklist: Physical (What should be included?) | Shift Checklist: Physical (What should be included?) | ||
+ | |||
Sift Summary: At the end of the shift in the Logbook (What should be included?) | Sift Summary: At the end of the shift in the Logbook (What should be included?) | ||
+ | |||
Google Doc or Wiki? | Google Doc or Wiki? |
Revision as of 20:03, 5 May 2020
In the process of complete the documentation needed for the shift workers to be in the DNP Lab at UNH. The following sections need to be included:
Section | Responsible of
Documentation |
---|---|
Monitor NMR data and check data output. | David |
Ramp up and down the magnet. | Google Doc/David |
Monitor and operate the microwaves / know how to find correct frequency. | Ellie/David |
VNA/VME swaps and calibrations | Ellie/David |
Setup system for changes in the polarization parameters (B, T, NMR, target…)
Physics Documentation |
Karl |
Log and report changes in the system, | Nathaly |
Monitor vacuum pumps and change or replace a pump if needed. | Nathaly |
Monitor flowmeters. | Nathaly |
Monitor shells pressure and follow the procedures of a possible leak. | Nathaly |
Monitor/Operating needle valves. | Google Doc/Michael |
Monitor fridge temperatures and make sure to turn on/off heaters inside the Fridge. | Karl |
Heat Straps monitor / External heater of the separator line | Ellie/Nathaly |
Monitor LHe level in the Magnet and call for fillings. | Google Doc |
Monitor LHe in the Fridge and adjust them if needed | Future Work |
Magnet refills. | Google Doc |
Target swaps | Karl |
Repair NMR cable | Marie |
Calculation of LHe to vapor to convert to flowmeter reading. | Michael |
Google Doc means that part of the section or the section is already written here.
Future Discussion:
Define Shift Leader and target operators tasks and names
Shift Checklist: Physical (What should be included?)
Sift Summary: At the end of the shift in the Logbook (What should be included?)
Google Doc or Wiki?