Difference between revisions of "Shift Workers Documentation"
From Nuclear Physics Group Documentation Pages
Jump to navigationJump to search| Line 12: | Line 12: | ||
|Ramp up and down the magnet. | |Ramp up and down the magnet. | ||
|Google Doc/David | |Google Doc/David | ||
| + | |- | ||
| + | |Monitor and operate the microwaves / know how to find correct frequency. | ||
| + | |Ellie/David | ||
| + | |- | ||
| + | |VNA/VME swaps and calibrations | ||
| + | |Ellie/David | ||
| + | |- | ||
| + | |Setup system for changes in the polarization parameters (B, T, NMR, target…) | ||
| + | Physics Documentation | ||
| + | |Karl | ||
| + | |- | ||
| + | |Log and report changes in the system, | ||
| + | |Nathaly | ||
| + | |- | ||
| + | |Monitor vacuum pumps and change or replace a pump if needed. | ||
| + | |Nathaly | ||
| + | |- | ||
| + | |Monitor flowmeters. | ||
| + | |Nathaly | ||
| + | |- | ||
| + | |Monitor shells pressure and follow the procedures of a possible leak. | ||
| + | |Nathaly | ||
| + | |- | ||
| + | |Monitor/Operating needle valves. | ||
| + | |Google Doc/Michael | ||
| + | |- | ||
| + | |Monitor fridge temperatures and make sure to turn on/off heaters inside the Fridge. | ||
| + | |Karl | ||
| + | |- | ||
| + | |Heat Straps monitor / External heater of the separator line | ||
| + | |Ellie/Nathaly | ||
| + | |- | ||
| + | |Monitor LHe level in the Magnet and call for fillings. | ||
| + | |Google Doc | ||
| + | |- | ||
| + | |Monitor LHe in the Fridge and adjust them if needed | ||
| + | |Future Work | ||
| + | |- | ||
| + | |Magnet refills. | ||
| + | |Google Doc | ||
| + | |- | ||
| + | |Target swaps | ||
| + | |Karl | ||
| + | |- | ||
| + | |Repair NMR cable | ||
| + | |Marie | ||
| + | |- | ||
| + | |Calculation of LHe to vapor to convert to flowmeter reading. | ||
| + | |Michael | ||
| + | |} | ||
| − | + | Google Doc means that part of the section or the section is already written [https://docs.google.com/document/d/1ecbCTTtgoKBhofpUS1OsZVxOxAfA9XxAiUHVvF13A3o/edit here]. | |
| + | |||
| + | Future Discussion: | ||
| + | Define Shift Leader and target operators tasks and names | ||
| + | Shift Checklist: Physical (What should be included?) | ||
| + | Sift Summary: At the end of the shift in the Logbook (What should be included?) | ||
| + | Google Doc or Wiki? | ||
Revision as of 20:02, 5 May 2020
In the process of complete the documentation needed for the shift workers to be in the DNP Lab at UNH. The following sections need to be included:
| Section | Responsible of
Documentation |
|---|---|
| Monitor NMR data and check data output. | David |
| Ramp up and down the magnet. | Google Doc/David |
| Monitor and operate the microwaves / know how to find correct frequency. | Ellie/David |
| VNA/VME swaps and calibrations | Ellie/David |
| Setup system for changes in the polarization parameters (B, T, NMR, target…)
Physics Documentation |
Karl |
| Log and report changes in the system, | Nathaly |
| Monitor vacuum pumps and change or replace a pump if needed. | Nathaly |
| Monitor flowmeters. | Nathaly |
| Monitor shells pressure and follow the procedures of a possible leak. | Nathaly |
| Monitor/Operating needle valves. | Google Doc/Michael |
| Monitor fridge temperatures and make sure to turn on/off heaters inside the Fridge. | Karl |
| Heat Straps monitor / External heater of the separator line | Ellie/Nathaly |
| Monitor LHe level in the Magnet and call for fillings. | Google Doc |
| Monitor LHe in the Fridge and adjust them if needed | Future Work |
| Magnet refills. | Google Doc |
| Target swaps | Karl |
| Repair NMR cable | Marie |
| Calculation of LHe to vapor to convert to flowmeter reading. | Michael |
Google Doc means that part of the section or the section is already written here.
Future Discussion: Define Shift Leader and target operators tasks and names Shift Checklist: Physical (What should be included?) Sift Summary: At the end of the shift in the Logbook (What should be included?) Google Doc or Wiki?