Difference between revisions of "Shift Workers Documentation"
From Nuclear Physics Group Documentation Pages
Jump to navigationJump to search| Line 7: | Line 7: | ||
Documentation  | Documentation  | ||
|-  | |-  | ||
| − | |Monitor NMR data and check data output.  | + | |[[Monitor NMR data and check data output.]]  | 
|David  | |David  | ||
|-  | |-  | ||
| − | |Ramp up and down the magnet.  | + | |[[Ramp up and down the magnet.]]  | 
|Google Doc/David    | |Google Doc/David    | ||
|-  | |-  | ||
| − | |Monitor and operate the microwaves / know how to find correct frequency.  | + | |[[Monitor and operate the microwaves / know how to find correct frequency.]]  | 
|Ellie/David  | |Ellie/David  | ||
|-  | |-  | ||
| − | |VNA/VME swaps and calibrations	  | + | |[[VNA/VME swaps and calibrations]]  | 
|Ellie/David  | |Ellie/David  | ||
|-  | |-  | ||
| − | |Setup system for changes in the polarization parameters (B, T, NMR, target…)  | + | |[[Setup system for changes in the polarization parameters (B, T, NMR, target…)  | 
| − | Physics Documentation  | + | Physics Documentation]]  | 
|Karl  | |Karl  | ||
|-  | |-  | ||
| − | |Log and report changes in the system,	  | + | |[[Log and report changes in the system]],  | 
|Nathaly  | |Nathaly  | ||
|-  | |-  | ||
| − | |Monitor vacuum pumps and change or replace a pump if needed.	  | + | |[[Monitor vacuum pumps and change or replace a pump if needed.]]  | 
|Nathaly  | |Nathaly  | ||
|-  | |-  | ||
| − | |Monitor flowmeters.   | + | |[[Monitor flowmeters.]]  | 
|Nathaly  | |Nathaly  | ||
|-  | |-  | ||
| − | |Monitor shells pressure and follow the procedures of a possible leak.	  | + | |[[Monitor shells pressure and follow the procedures of a possible leak.]]  | 
|Nathaly  | |Nathaly  | ||
|-  | |-  | ||
| − | |Monitor/Operating needle valves.  | + | |[[Monitor/Operating needle valves.]]  | 
|Google Doc/Michael  | |Google Doc/Michael  | ||
|-  | |-  | ||
| − | |Monitor fridge temperatures and make sure to turn on/off heaters inside the Fridge.	  | + | |[[Monitor fridge temperatures and make sure to turn on/off heaters inside the Fridge.]]  | 
|Karl  | |Karl  | ||
|-  | |-  | ||
| − | |Heat Straps monitor / External heater of the separator line	  | + | |[[Heat Straps monitor / External heater of the separator line]]  | 
|Ellie/Nathaly  | |Ellie/Nathaly  | ||
|-  | |-  | ||
| − | |Monitor LHe level in the Magnet and call for fillings.	  | + | |[[Monitor LHe level in the Magnet and call for fillings.]]  | 
|Google Doc  | |Google Doc  | ||
|-  | |-  | ||
| − | |Monitor LHe in the Fridge and adjust them if needed	  | + | |[[Monitor LHe in the Fridge and adjust them if needed]]  | 
|Future Work  | |Future Work  | ||
|-  | |-  | ||
| − | |Magnet refills.	  | + | |[[Magnet refills.]]  | 
|Google Doc  | |Google Doc  | ||
|-  | |-  | ||
| − | |Target swaps  | + | |[[Target swaps]]  | 
|Karl  | |Karl  | ||
|-  | |-  | ||
| − | |Repair NMR cable	  | + | |[[Repair NMR cable]]  | 
|Marie  | |Marie  | ||
|-  | |-  | ||
| − | |Calculation of LHe to vapor to convert to flowmeter reading.	  | + | |[[Calculation of LHe to vapor to convert to flowmeter reading.]]  | 
|Michael  | |Michael  | ||
|}  | |}  | ||
Revision as of 20:23, 28 May 2020
In the process of complete the documentation needed for the shift workers to be in the DNP Lab at UNH. The following sections need to be included:
Google Doc means that part of the section or the section is already written here.
Future Discussion:
Define Shift Leader and target operators tasks and names
Shift Checklist: Physical (What should be included?)
Shift Summary: At the end of the shift in the Logbook (What should be included?)
Google Doc or Wiki?