Difference between revisions of "2018-04-10 Cool Down Analysis"
From Nuclear Physics Group Documentation Pages
Jump to navigationJump to search| Line 21: | Line 21: | ||
| The bypass valve was closed and the heat exchanger was opened slightly. The roots were off and a secondary small roughing pump was pumping the cryostat space. | | The bypass valve was closed and the heat exchanger was opened slightly. The roots were off and a secondary small roughing pump was pumping the cryostat space. | ||
|} | |} | ||
| − | [[Image:04-12-2018 magnetT.jpg| | + | [[Image:04-12-2018 magnetT.jpg|1000px]] |
| − | |||
| − | |||
= 04/10/2018 Magnet Precool with LN2 = | = 04/10/2018 Magnet Precool with LN2 = | ||
Revision as of 15:01, 23 April 2018
04/12/2018 Fridge Cooldown
The fridge was cool-down starting from room temperature on April 12. The steps that day can be summarized as:
| Time | Process | Comment |
|---|---|---|
| 10:30 am - 2 pm | Cooling down the separator | Both needle valves closed and Separator pump flow constant at ~ 5 slm |
| 2 pm - 5 pm | Nose cooldown to 1.2 K. | The needle valves were opened (both). The roots were on When the temperature in the nose decrease bellow 4 K, the bypass valve was closed and the heat exchanger was opened slightly. |
| 5 pm - 10 pm | Thermal equilibrium conditions ~1.9 K. | The bypass valve was closed and the heat exchanger was opened slightly. The roots were off and a secondary small roughing pump was pumping the cryostat space. |