Difference between revisions of "Shift Workers Documentation"
From Nuclear Physics Group Documentation Pages
Jump to navigationJump to search| Line 49: | Line 49: | ||
|Future Work | |Future Work | ||
|- | |- | ||
| − | |[[Magnet refills | + | |[[Magnet refills]] |
|Google Doc | |Google Doc | ||
|- | |- | ||
Latest revision as of 19:21, 14 August 2020
In the process of complete the documentation needed for the shift workers to be in the DNP Lab at UNH. The following sections need to be included:
| Section | Responsible of
Documentation |
|---|---|
| Monitor NMR data and check data output | David |
| Ramp up and down the magnet | Google Doc/David |
| TE Measurements | Karl/David |
| Monitor and operate the microwaves / know how to find correct frequency | Ellie/David |
| VNA/VME swaps and calibrations | Ellie/David |
| Setup system for changes in the polarization parameters (B, T, NMR, target…) Physics Documentation | Karl |
| Log and report changes in the system | Nathaly |
| Monitor Vacuum System | Nathaly |
| Monitor flow meters | Nathaly |
| Monitor/Operating needle valves | Google Doc/Michael |
| Monitor fridge temperatures and make sure to turn on/off heaters inside the Fridge | Karl |
| Heat Straps monitor / External heater of the separator line | Ellie/Nathaly |
| Monitor LHe level in the Magnet and call for fillings | Google Doc |
| Monitor LHe in the Fridge and adjust them if needed | Future Work |
| Magnet refills | Google Doc |
| Target swaps | Karl |
| Repair NMR cable | Marie |
| Calculation of LHe to vapor to convert to flowmeter reading | Michael |
Google Doc means that part of the section or the section is already written here.
Future Discussion:
Define Shift Leader and target operators tasks and names
Shift Checklist: Physical (What should be included?)
Shift Summary: At the end of the shift in the Logbook (What should be included?)
Google Doc or Wiki?