Difference between revisions of "Shift Workers Documentation"
From Nuclear Physics Group Documentation Pages
Jump to navigationJump to search| (9 intermediate revisions by 3 users not shown) | |||
| Line 7: | Line 7: | ||
Documentation | Documentation | ||
|- | |- | ||
| − | |Monitor NMR data and check data output | + | |[[Data Output Manual|Monitor NMR data and check data output]] |
|David | |David | ||
|- | |- | ||
| − | |Ramp up and down the magnet | + | |[[Ramp up and down the magnet]] |
|Google Doc/David | |Google Doc/David | ||
|- | |- | ||
| − | |Monitor and operate the microwaves / know how to find correct frequency | + | |[[TE Measurements]] |
| + | |Karl/David | ||
| + | |- | ||
| + | |[[Monitor and operate the microwaves / know how to find correct frequency]] | ||
|Ellie/David | |Ellie/David | ||
|- | |- | ||
| − | |VNA/VME swaps and calibrations | + | |[[VNA/VME swaps and calibrations]] |
|Ellie/David | |Ellie/David | ||
|- | |- | ||
| − | |Setup system for changes in the polarization parameters (B, T, NMR, target…) | + | |[[Setup system for changes in the polarization parameters (B, T, NMR, target…) Physics Documentation]] |
| − | Physics Documentation | ||
|Karl | |Karl | ||
|- | |- | ||
| − | |Log and report changes in the system | + | |[[Log and report changes in the system]] |
| − | |||
| − | |||
| − | |||
|Nathaly | |Nathaly | ||
|- | |- | ||
| − | |Monitor | + | |[[Monitor Vacuum System]] |
|Nathaly | |Nathaly | ||
|- | |- | ||
| − | |Monitor | + | |[[Monitor flow meters]] |
|Nathaly | |Nathaly | ||
|- | |- | ||
| − | |Monitor/Operating needle valves | + | |[[Monitor/Operating needle valves]] |
|Google Doc/Michael | |Google Doc/Michael | ||
|- | |- | ||
| − | |Monitor fridge temperatures and make sure to turn on/off heaters inside the Fridge | + | |[[Monitor fridge temperatures and make sure to turn on/off heaters inside the Fridge]] |
|Karl | |Karl | ||
|- | |- | ||
| − | |Heat Straps monitor / External heater of the separator line | + | |[[Heat Straps monitor / External heater of the separator line]] |
|Ellie/Nathaly | |Ellie/Nathaly | ||
|- | |- | ||
| − | |Monitor LHe level in the Magnet and call for fillings | + | |[[Monitor LHe level in the Magnet and call for fillings]] |
|Google Doc | |Google Doc | ||
|- | |- | ||
| − | |Monitor LHe in the Fridge and adjust them if needed | + | |[[Monitor LHe in the Fridge and adjust them if needed]] |
|Future Work | |Future Work | ||
|- | |- | ||
| − | |Magnet refills | + | |[[Magnet refills]] |
|Google Doc | |Google Doc | ||
|- | |- | ||
| − | |Target swaps | + | |[[Target swaps]] |
|Karl | |Karl | ||
|- | |- | ||
| − | |Repair NMR cable | + | |[[Repair NMR cable]] |
|Marie | |Marie | ||
|- | |- | ||
| − | |Calculation of LHe to vapor to convert to flowmeter reading | + | |[[Calculation of LHe to vapor to convert to flowmeter reading]] |
|Michael | |Michael | ||
|} | |} | ||
Latest revision as of 19:21, 14 August 2020
In the process of complete the documentation needed for the shift workers to be in the DNP Lab at UNH. The following sections need to be included:
| Section | Responsible of
Documentation |
|---|---|
| Monitor NMR data and check data output | David |
| Ramp up and down the magnet | Google Doc/David |
| TE Measurements | Karl/David |
| Monitor and operate the microwaves / know how to find correct frequency | Ellie/David |
| VNA/VME swaps and calibrations | Ellie/David |
| Setup system for changes in the polarization parameters (B, T, NMR, target…) Physics Documentation | Karl |
| Log and report changes in the system | Nathaly |
| Monitor Vacuum System | Nathaly |
| Monitor flow meters | Nathaly |
| Monitor/Operating needle valves | Google Doc/Michael |
| Monitor fridge temperatures and make sure to turn on/off heaters inside the Fridge | Karl |
| Heat Straps monitor / External heater of the separator line | Ellie/Nathaly |
| Monitor LHe level in the Magnet and call for fillings | Google Doc |
| Monitor LHe in the Fridge and adjust them if needed | Future Work |
| Magnet refills | Google Doc |
| Target swaps | Karl |
| Repair NMR cable | Marie |
| Calculation of LHe to vapor to convert to flowmeter reading | Michael |
Google Doc means that part of the section or the section is already written here.
Future Discussion:
Define Shift Leader and target operators tasks and names
Shift Checklist: Physical (What should be included?)
Shift Summary: At the end of the shift in the Logbook (What should be included?)
Google Doc or Wiki?