Difference between revisions of "Shift Workers Documentation"
From Nuclear Physics Group Documentation Pages
Jump to navigationJump to search(12 intermediate revisions by 3 users not shown) | |||
Line 7: | Line 7: | ||
Documentation | Documentation | ||
|- | |- | ||
− | |Monitor NMR data and check data output | + | |[[Data Output Manual|Monitor NMR data and check data output]] |
|David | |David | ||
|- | |- | ||
− | |Ramp up and down the magnet | + | |[[Ramp up and down the magnet]] |
|Google Doc/David | |Google Doc/David | ||
+ | |- | ||
+ | |[[TE Measurements]] | ||
+ | |Karl/David | ||
+ | |- | ||
+ | |[[Monitor and operate the microwaves / know how to find correct frequency]] | ||
+ | |Ellie/David | ||
+ | |- | ||
+ | |[[VNA/VME swaps and calibrations]] | ||
+ | |Ellie/David | ||
+ | |- | ||
+ | |[[Setup system for changes in the polarization parameters (B, T, NMR, target…) Physics Documentation]] | ||
+ | |Karl | ||
+ | |- | ||
+ | |[[Log and report changes in the system]] | ||
+ | |Nathaly | ||
+ | |- | ||
+ | |[[Monitor Vacuum System]] | ||
+ | |Nathaly | ||
+ | |- | ||
+ | |[[Monitor flow meters]] | ||
+ | |Nathaly | ||
+ | |- | ||
+ | |[[Monitor/Operating needle valves]] | ||
+ | |Google Doc/Michael | ||
+ | |- | ||
+ | |[[Monitor fridge temperatures and make sure to turn on/off heaters inside the Fridge]] | ||
+ | |Karl | ||
+ | |- | ||
+ | |[[Heat Straps monitor / External heater of the separator line]] | ||
+ | |Ellie/Nathaly | ||
+ | |- | ||
+ | |[[Monitor LHe level in the Magnet and call for fillings]] | ||
+ | |Google Doc | ||
+ | |- | ||
+ | |[[Monitor LHe in the Fridge and adjust them if needed]] | ||
+ | |Future Work | ||
+ | |- | ||
+ | |[[Magnet refills]] | ||
+ | |Google Doc | ||
+ | |- | ||
+ | |[[Target swaps]] | ||
+ | |Karl | ||
+ | |- | ||
+ | |[[Repair NMR cable]] | ||
+ | |Marie | ||
+ | |- | ||
+ | |[[Calculation of LHe to vapor to convert to flowmeter reading]] | ||
+ | |Michael | ||
+ | |} | ||
− | + | Google Doc means that part of the section or the section is already written [https://docs.google.com/document/d/1ecbCTTtgoKBhofpUS1OsZVxOxAfA9XxAiUHVvF13A3o/edit here]. | |
+ | |||
+ | '''Future Discussion:''' | ||
+ | |||
+ | Define Shift Leader and target operators tasks and names | ||
+ | |||
+ | Shift Checklist: Physical (What should be included?) | ||
+ | |||
+ | Shift Summary: At the end of the shift in the Logbook (What should be included?) | ||
+ | |||
+ | Google Doc or Wiki? |
Latest revision as of 19:21, 14 August 2020
In the process of complete the documentation needed for the shift workers to be in the DNP Lab at UNH. The following sections need to be included:
Section | Responsible of
Documentation |
---|---|
Monitor NMR data and check data output | David |
Ramp up and down the magnet | Google Doc/David |
TE Measurements | Karl/David |
Monitor and operate the microwaves / know how to find correct frequency | Ellie/David |
VNA/VME swaps and calibrations | Ellie/David |
Setup system for changes in the polarization parameters (B, T, NMR, target…) Physics Documentation | Karl |
Log and report changes in the system | Nathaly |
Monitor Vacuum System | Nathaly |
Monitor flow meters | Nathaly |
Monitor/Operating needle valves | Google Doc/Michael |
Monitor fridge temperatures and make sure to turn on/off heaters inside the Fridge | Karl |
Heat Straps monitor / External heater of the separator line | Ellie/Nathaly |
Monitor LHe level in the Magnet and call for fillings | Google Doc |
Monitor LHe in the Fridge and adjust them if needed | Future Work |
Magnet refills | Google Doc |
Target swaps | Karl |
Repair NMR cable | Marie |
Calculation of LHe to vapor to convert to flowmeter reading | Michael |
Google Doc means that part of the section or the section is already written here.
Future Discussion:
Define Shift Leader and target operators tasks and names
Shift Checklist: Physical (What should be included?)
Shift Summary: At the end of the shift in the Logbook (What should be included?)
Google Doc or Wiki?