Difference between revisions of "Sysadmin Todo List"
From Nuclear Physics Group Documentation Pages
Jump to navigationJump to searchLine 4: | Line 4: | ||
* Make power supply mount for taro | * Make power supply mount for taro | ||
* Consolodate backups to get a drive for gourd | * Consolodate backups to get a drive for gourd | ||
+ | * Check out 250gb sata drive found in old maxtor box -maybe a good replacement for gourd's drive? | ||
* Label hard disks | * Label hard disks | ||
* Repair local network connection on Gourd. | * Repair local network connection on Gourd. | ||
Line 16: | Line 17: | ||
- Fans | - Fans | ||
- Network cables | - Network cables | ||
− | |||
* Look into upgrades/patches for all our systems. | * Look into upgrades/patches for all our systems. | ||
* Look into monitorring that is already installed: RAIDs etc. | * Look into monitorring that is already installed: RAIDs etc. |
Revision as of 14:51, 31 May 2007
- Clean up 202
- Figure out what's worth keeping - Figure out what doesn't belong here
- Make power supply mount for taro
- Consolodate backups to get a drive for gourd
- Check out 250gb sata drive found in old maxtor box -maybe a good replacement for gourd's drive?
- Label hard disks
- Repair local network connection on Gourd.
- Repair LDAP on Gourd (probably caused by net connection).
- Replace failed drive in Gourd - 250gb sata
- Documentation for networking - we have no idea which config files are actually doing anything.
- Take a look at spamassassin - Improve Performance of this if possible.
- Test unknown equipment:
- Power supplies - UPS - Power Strips - Fans - Network cables
- Look into upgrades/patches for all our systems.
- Look into monitorring that is already installed: RAIDs etc.
- Look into Red Hat Enterprise Level 5, the latest version. Update Tomato to RHEL5 and check all services einstein currently provides. Then switch einstein <-> tomato, and then upgrade what was originally einstein. Look into making an einstein, tomato failsafe setup.
Completed Tasks
- Get ahold of a multimeter so we can test supplies and cables. Got a tiny portable one.
- Order new power supply for Taro Ordered from Newegg 5/24/2007
- Weed out unneccesary cables, we don't need a full box of ata33 and another of ata66. Consolodated to one box
- Installed new power supply for Taro.
- Get printer (Myriad) working.
- Set up skype.
- Fix sound on improv so we can use skype and music. sound was set to alsa, setting to OSS fixed it. should have worked either way though.