Difference between revisions of "2018-04-10 Cool Down Analysis"
From Nuclear Physics Group Documentation Pages
Jump to navigationJump to searchLine 26: | Line 26: | ||
|} | |} | ||
− | [[Image:04-12-2018 magnetT.jpg|frame|thumbnail| | + | [[Image:04-12-2018 magnetT.jpg|frame|thumbnail|100px|Magnet temperatures and Helium lost estimations.]] |
[[Image:04-12 fridgeT.png|1000px]] | [[Image:04-12 fridgeT.png|1000px]] |
Revision as of 15:39, 23 April 2018
04/12/2018 Fridge Cooldown
The fridge was cool-down starting from room temperature on April 12. The steps that day can be summarized as:
Time | Process | Comment | ||||
---|---|---|---|---|---|---|
10:30 am - 2 pm | Cooling down the separator | Both needle valves closed and Separator pump flow constant at ~ 5 slm | ||||
2 pm - 5 pm | Nose cooldown to 1.2 K. | The needle valves were opened (both). The roots were on When the temperature in the nose decrease bellow 4 K, the bypass valve was closed and the heat exchanger was opened slightly. | ||||
5 pm - 10 pm | Thermal equilibrium conditions ~1.9 K. | The bypass valve was closed and the heat exchanger was opened slightly. The roots were off and a secondary small roughing pump was pumping the cryostat space. | 10 pm - 12 am | System off. | The needles valve were close and the separator pump was off. |