Difference between revisions of "Monitor LHe level in the Magnet and call for fillings"

From Nuclear Physics Group Documentation Pages
Jump to navigationJump to search
(Created page with " =Filling the LHe Level in the Magnet= The procedure for filling the magnet with liquid helium is outlined in the 'Transferring Liquid Helium' section of the Cool-Down Proce...")
 
(Blanked the page)
 
Line 1: Line 1:
  
 
=Filling the LHe Level in the Magnet=
 
 
The procedure for filling the magnet with liquid helium is outlined in the 'Transferring Liquid Helium' section of the Cool-Down Procedures document found at https://docs.google.com/document/d/1ecbCTTtgoKBhofpUS1OsZVxOxAfA9XxAiUHVvF13A3o/edit#heading=h.c3x3myzfwqkv
 

Latest revision as of 20:39, 12 August 2020