Difference between revisions of "2018-04-10 Cool Down Analysis"

From Nuclear Physics Group Documentation Pages
Jump to navigationJump to search
Line 20: Line 20:
 
|Thermal equilibrium conditions ~1.9 K.
 
|Thermal equilibrium conditions ~1.9 K.
 
| The bypass valve was closed and the heat exchanger was opened slightly.  The roots were off and a secondary small roughing pump was pumping the cryostat space.
 
| The bypass valve was closed and the heat exchanger was opened slightly.  The roots were off and a secondary small roughing pump was pumping the cryostat space.
|
+
|-
 
! 10 pm - 12 am
 
! 10 pm - 12 am
 
| System off.
 
| System off.
Line 29: Line 29:
  
  
'''Magnet Temperatures'''
+
'''Magnet Temperatures and Helium lost estimations'''
  
 +
[[Image:04-12-2018 magnetT.jpg|1000px]]
  
 +
""Fridge Temperatures during the complete day""
  
[[Image:04-12-2018 magnetT.jpg|1000px]]
 
 
[[Image:04-12 fridgeT.png|1000px]]
 
[[Image:04-12 fridgeT.png|1000px]]
 +
 +
""Fridge Temperatures during the cooling process""
 +
 
[[Image:04-12 fridge coolingT.png|900px]]
 
[[Image:04-12 fridge coolingT.png|900px]]
 +
 +
""Fridge Temperatures when the nose was at 1.12 K ""
 +
 
[[Image:04-12 fridge 1KT.png|1000px]]
 
[[Image:04-12 fridge 1KT.png|1000px]]
 +
 +
""Fridge Temperatures when the nose was at 1.9 K ""
 +
 
[[Image:04-12 fridge TET.jpg|1000px]]
 
[[Image:04-12 fridge TET.jpg|1000px]]
 +
 +
""Fridge Temperatures when the nose was at 1.9 K ""
 +
 +
""Target Temperatures during the complete day""
 +
 
[[Image:04-12 targetT.jpg|1000px]]
 
[[Image:04-12 targetT.jpg|1000px]]
 +
 +
""CCS3 and Vapor Pressure measurements""
 +
 
[[Image:04-12-2018 targetgoodT.jpg|1000px]]
 
[[Image:04-12-2018 targetgoodT.jpg|1000px]]
 +
 +
""CCS3 and Pumps Flows""
 +
 
[[Image:04-12-2018 targetflowT.jpg|1000px]]
 
[[Image:04-12-2018 targetflowT.jpg|1000px]]
 +
 +
 +
""Shells Pressure and CCSF1 in the Fridge""
 +
 
[[Image:04-12 pressure shells.jpg|1000px]]
 
[[Image:04-12 pressure shells.jpg|1000px]]
  

Revision as of 15:57, 23 April 2018

04/12/2018 Fridge Cooldown

The fridge was cool-down starting from room temperature on April 12. The steps that day can be summarized as:

The table's caption
Time Process Comment
10:30 am - 2 pm Cooling down the separator Both needle valves closed and Separator pump flow constant at ~ 5 slm
2 pm - 5 pm Nose cooldown to 1.2 K. The needle valves were opened (both). The roots were on When the temperature in the nose decrease bellow 4 K, the bypass valve was closed and the heat exchanger was opened slightly.
5 pm - 10 pm Thermal equilibrium conditions ~1.9 K. The bypass valve was closed and the heat exchanger was opened slightly. The roots were off and a secondary small roughing pump was pumping the cryostat space.
10 pm - 12 am System off. The needles valve were close and the separator pump was off.



Magnet Temperatures and Helium lost estimations

04-12-2018 magnetT.jpg

""Fridge Temperatures during the complete day""

04-12 fridgeT.png

""Fridge Temperatures during the cooling process""

04-12 fridge coolingT.png

""Fridge Temperatures when the nose was at 1.12 K ""

04-12 fridge 1KT.png

""Fridge Temperatures when the nose was at 1.9 K ""

04-12 fridge TET.jpg

""Fridge Temperatures when the nose was at 1.9 K ""

""Target Temperatures during the complete day""

04-12 targetT.jpg

""CCS3 and Vapor Pressure measurements""

04-12-2018 targetgoodT.jpg

""CCS3 and Pumps Flows""

04-12-2018 targetflowT.jpg


""Shells Pressure and CCSF1 in the Fridge""

04-12 pressure shells.jpg

04/10/2018 Magnet Precool with LN2

04-10-2018 magnet precool magnetT.png 04-10-2018 magnet precool fridgeT.png 04-10-2018 magnet precool targetT.png 04-10-2018 magnet precool pressure shells.png